DESCRIPTION OF PROJECT
The project includes demolition, partial renovation of the historic façade, a river walk connection with outdoor plaza, and new construction of a performance venue with multi-functional halls and support spaces. The new facility celebrates the unique character of San Antonio and will be a gateway to cultural arts for residents and visitors alike. The renovated center will provide venues for the San Antonio Symphony, San Antonio Opera and Ballet San Antonio, among many other performing arts groups. Linbeck/Zachry JV has been selected as CMAR for the work and we are soliciting interested sub-contractors, vendors and material suppliers, to include Small, Minority, and Woman-Owned Business Enterprises from the local market.
PROJECT INFORMATION AT SCHEMATIC DESIGN
| Est. Construction Start: Second Quarter 2011 | Est. Construction Cost: $97,000,000 | Total Building: 153,000 gsf |
| Partial Trade Listing: | ||
| Demolition | Window Walls/Storefront | Paint |
| Earthwork/Excavation | Wood and Metal Doors/Frames/Hardware | Acoustical Wall Covering |
| Drill Piers | CMU | Millwork/Casework |
| Cast In Place Concrete | Gyp/Acoustical Ceiling Tile | Window Covers |
| Waterproofing/Caulking | STC Rated Custom Doors | Loading Dock Equipment |
| Structural Steel Fabrication/Erection | Elevators | Toilet Partitions/Accessible |
| Misc. Steel and Stairs | Scaffolding | MEPF Systems |
| Ornamental Metals | Carpet/Resilient Tile/Sheet Vinyl Floors | Theatrical Equipment |
| Roofing | Stone/Ceramic Tile Floors | Site Utilities |
| Metal Panel Systems | Terrazzo | Hardscape |
| Renovation/Restoration of Historic Stone Façade | Wood Flooring | Landscape/Irrigation |
| Signage |
LINBECK/ZACHRY MEMO TO PROSPECTIVE BIDDERS
SUBCONTRACTOR QUALIFICATION PACKAGE